Events Calendar

Download as iCal file
Plenty River Trail
Saturday 16 September 2017, 10:30am - 03:30pm
Hits : 264
by This email address is being protected from spambots. You need JavaScript enabled to view it.

Beginning at Epping Railway Station, a ride down Darebin Creek Trail to connect with Metropolitan Ring Road Trail and on to Greensborough for lunch. From there we pick up the top of Plenty River Trail and ride the valley path all the way to Main Yarra Trail. We can keep going through to the City or finish in Fairfield. 35 km.